A multiplier should address demonstrated financing gaps, additional production and supply impacts. Shelby does not propose a numerical multiplier without Australian project-cost and supply modelling, including the share of compliance value that reaches producers.
Shelby’s position, not adopted government policy or confirmation of lodgement. Historical evidence and policy-modelling assumptions are distinguished in the response.

The official consultation question
Q08 · §2.6(c) · paper page 17
What factors would need to be considered to determine an appropriate multiplier level over time?
Shelby’s response
The multiplier should be large enough to help close the financing gap, with its value assessed against additional production, emissions benefits and domestic supply impacts. We would not nominate a numerical multiplier without Australian project-cost and supply modelling.
Consider capital and operating costs, feedstock collection, connection and delivery, gas revenue, certificates, contracted co-product income and other support. Also assess the exporter’s compliance benefit and how much reaches the producer through the purchasing agreement.
Frequently asked questions
What is Shelby’s position on setting a renewable gas multiplier?
A multiplier should address demonstrated financing gaps, additional production and supply impacts. Shelby does not propose a numerical multiplier without Australian project-cost and supply modelling, including the share of compliance value that reaches producers.
What should a project team read alongside this answer?
Read the linked commercial guides and original question. Separate the response’s recommendations and illustrative assumptions from source-reported operating evidence.
Sources & References
- Department of Climate Change, Energy, the Environment and Water, National Renewable Gas Policy consultation
Publication: Date not verified
Observation period: Not recorded
Relevant page / section: Claim-level locator not yet verified
Last link / title verification: 2026-10-11
Publisher link checked; individual claims, costs and regulatory applicability still require review.
Check scope and current applicability before relying on this reference.
- Department of Climate Change, Energy, the Environment and Water, National Renewable Gas Policy consultation paper
Publication: 2026-08
Observation period: Australia; 2026 consultation
Relevant page / section: Consultation questions; use answer-specific paper page and question reference
Last link / title verification: 2026-10-11
Publisher link checked; individual claims, costs and regulatory applicability still require review.
Source for questions/context, not proof of an implemented support mechanism. Question text attribution: Commonwealth, CC BY 4.0, as noted in Shelby’s supplied consultation response.
- Creative Commons, Attribution 4.0 International
Publication: Date not verified
Observation period: Not recorded
Relevant page / section: Claim-level locator not yet verified
Last link / title verification: 2026-10-11
Publisher link checked; individual claims, costs and regulatory applicability still require review.
Check scope and current applicability before relying on this reference.