Learn from Australian projects and operating assets.
Australian bioenergy projects demonstrate several routes: on-site heat and power, upgraded biomethane, and advanced conversion demonstrations. Read each record by its technology, status, resource and reported performance. Australian Renewable Energy Agency (ARENA), Jemena Gas Network – Malabar Biomethane Injection Project – Final Report (Internal research locator: public evidence not yet verified)

Compare like-for-like cases
Malabar and Goulburn serve different energy markets; Richgro and wastewater facilities provide additional operating contexts. Development proposals belong alongside, but separate from, operating evidence.
Use the register to ask better questions
Record nameplate capacity, actual output and source date separately. Identify current gas use, contractual commitments and available surplus before proposing an upgrade or new customer.
How to read a project case study
Project announcements often describe design capacity, while operating reports describe what was actually produced. Distinguish the two, and note the period, feedstock and customers involved. Public reports from funders such as ARENA frequently include lessons learned, which can be more useful than headline figures. Use each case to identify the questions your own project must answer, rather than as a benchmark that will transfer unchanged.
Use project evidence without overstating it
Separate an announcement, funded development, commissioning milestone and sustained operation. Record the publication date, host resource, conversion pathway, stated capacity and actual evidence available. Where two entries use the same host gas or material, do not add them as independent supply. Contact operators and source owners for current status before using a case in customer, engineering or investment decisions.
Frequently asked questions
Is a listed project available for partnership or gas purchase?
A listing does not establish available supply or willingness to participate. Seek the operator’s current terms.
How should project case studies be compared?
Compare projects by technology, feedstock, scale, product, customer and operating status. Separate design capacity from reported production, and note the date and source of each figure so like-for-like comparisons are possible.
Where does project information come from?
Records draw on public sources such as ARENA project reports, Clean Energy Regulator registers, operator announcements and state planning records. Each record shows its source and date, and status can change after publication.
Sources & References
- Australian Renewable Energy Agency (ARENA), Goulburn Bioenergy Project
Publication: Date not verified
Observation period: Not recorded
Relevant page / section: Claim-level locator not yet verified
Last link / title verification: 2026-10-11
Publisher link checked; individual claims, costs and regulatory applicability still require review.
Check scope and current applicability before relying on this reference.
- Jemena, Malabar Biomethane Injection Plant | Jemena
Publication: Date not verified
Observation period: Not recorded
Relevant page / section: Claim-level locator not yet verified
Last link / title verification: 2026-10-11
Publisher link checked; individual claims, costs and regulatory applicability still require review.
Check scope and current applicability before relying on this reference.
- Australian Renewable Energy Agency (ARENA), Jemena Gas Network – Malabar Biomethane Injection Project – Commissioning Report
Publication: Date not verified
Observation period: Not recorded
Relevant page / section: Claim-level locator not yet verified
Last link / title verification: 2026-10-11
Publisher link checked; individual claims, costs and regulatory applicability still require review.
Check scope and current applicability before relying on this reference.
- Australian Renewable Energy Agency (ARENA), Delorean – SA1 Biomethane Upgrading Project
Publication: Date not verified
Observation period: Not recorded
Relevant page / section: Claim-level locator not yet verified
Last link / title verification: 2026-10-11
Publisher link checked; individual claims, costs and regulatory applicability still require review.
Check scope and current applicability before relying on this reference.
- Australian Renewable Energy Agency (ARENA), Horsley Park Bioenergy Project
Publication: Date not verified
Observation period: Not recorded
Relevant page / section: Claim-level locator not yet verified
Last link / title verification: 2026-10-11
Publisher link checked; individual claims, costs and regulatory applicability still require review.
Check scope and current applicability before relying on this reference.
- Shelby Bioenergy, Shelby’s National Renewable Gas Policy consultation response
Publication: 2026-10
Observation period: October 2026
Relevant page / section: Supplied company position
Last link / title verification: Not verified
Company position / supplied material, not independent evidence.
Proposals and scenarios, not adopted policy or market offers.
- Australian Renewable Energy Agency (ARENA), Jemena Gas Network – Malabar Biomethane Injection Project – Final Report
Publication: 2026-05-04
Observation period: Australia; Malabar project experience
Relevant page / section: Final report; site-specific operating experience
Last link / title verification: 2026-10-11
Publisher link checked; individual claims, costs and regulatory applicability still require review.
PDF publication path May 2026; project findings are site-specific.