Shelby Bioenergy · October 2026 · Australia

Biomethane production costs and cost drivers

Shelby does not report measured costs from an active Australian production project. The response cites published pathway-specific cost ranges and recommends transparent project economics, separating costs, support and co-product revenues rather than imposing a universal tariff.

Shelby’s position, not adopted government policy or confirmation of lodgement. Historical evidence and policy-modelling assumptions are distinguished in the response.

Loader, organic feedstock, digester and biomethane delivery tanker
Conceptual illustration · not a project photograph or engineering design

The official consultation question

Q21 · §4.1(a) · paper page 25

What are your current and projected levelised costs (A$ per GJ) over the next 5–10 years, broken down by technology type and scale? Please describe the key cost drivers behind these estimates, including any assumptions or factors that may influence future cost trajectories.

Shelby’s response

Shelby Bioenergy does not currently have an active Australian production project from which to report measured levelised costs. However; since our launch in Australia 2021 we have worked closely with well established international groups such as “Verdemobil” on detailed optimisation and modelling of over 50 biogas-upgrading / biomethane-injection sites and approximately 20 biogenic-CO2 liquefaction sites across France and Europe. Their installed base provides practical experience in repeatable modular engineering, commissioning, gas-quality control, operation and maintenance, grid injection, CO2 purification and liquefaction, storage and commercial product qualification.

Australian studies nevertheless provide a useful evidence base. Recent published estimates place biomethane production broadly around A$10-13/GJ for landfill pathways, A$15-25/GJ for anaerobic digestion of wastes and A$28-36/GJ for crop-residue pathways, with strong dependence on feedstock, scale, upgrading, connection and delivery.

Shelby therefore recommends that policy be designed against transparent project economics rather than a single universal tariff.

Typical drivers include feedstock collection and treatment, plant capacity and utilisation, energy consumption, methane recovery, financing, maintenance, connection and delivery. Existing-facility upgrades can reuse infrastructure, but must account for any displaced heat or electricity production. Over the next 5–10 years, standardised equipment and repeated installations offer opportunities to reduce costs; Australian forecasts should be established through supplier quotations and local operating evidence, with production costs, policy support and co-product revenues reported separately.

Frequently asked questions

What is Shelby’s position on biomethane production costs and cost drivers?

Shelby does not report measured costs from an active Australian production project. The response cites published pathway-specific cost ranges and recommends transparent project economics, separating costs, support and co-product revenues rather than imposing a universal tariff.

What should a project team read alongside this answer?

Read the linked commercial guides and original question. Separate the response’s recommendations and illustrative assumptions from source-reported operating evidence.

Sources & References

  • Department of Climate Change, Energy, the Environment and Water, National Renewable Gas Policy consultation

    Publication: Date not verified

    Observation period: Not recorded

    Relevant page / section: Claim-level locator not yet verified

    Last link / title verification: 2026-10-11

    Publisher link checked; individual claims, costs and regulatory applicability still require review.

    Check scope and current applicability before relying on this reference.

  • Department of Climate Change, Energy, the Environment and Water, National Renewable Gas Policy consultation paper

    Publication: 2026-08

    Observation period: Australia; 2026 consultation

    Relevant page / section: Consultation questions; use answer-specific paper page and question reference

    Last link / title verification: 2026-10-11

    Publisher link checked; individual claims, costs and regulatory applicability still require review.

    Source for questions/context, not proof of an implemented support mechanism. Question text attribution: Commonwealth, CC BY 4.0, as noted in Shelby’s supplied consultation response.

  • Creative Commons, Attribution 4.0 International

    Publication: Date not verified

    Observation period: Not recorded

    Relevant page / section: Claim-level locator not yet verified

    Last link / title verification: 2026-10-11

    Publisher link checked; individual claims, costs and regulatory applicability still require review.

    Check scope and current applicability before relying on this reference.