Solar Farm Land Screening

What this screen can tell you

This free Australian tool records what you know about land authority, area, use and constraints, then produces a preliminary checklist. It does not map a parcel, confirm grid capacity, value the land or establish planning approval. Exact location is optional and requires consent before saving for private expert review.

Preliminary checks

Enter what you know to see a private checklist. No capacity, planning approval or lease value is estimated.

Frequently asked questions

Is this a solar farm feasibility approval?

No. This is an initial checklist based on your answers. Engineering studies, network enquiries, environmental and heritage assessments, planning advice and commercial diligence are still required.

Does land area tell me the solar farm capacity?

No. Gross hectares do not establish usable land, layout, setbacks, connection capacity or MW output. This tool does not convert land area into system capacity.

Do I need to enter my exact land address?

No. You can view the checklist without entering an address. An approximate town or parcel reference is optional; sharing it with Shelby for a private review requires a separate opt-in. A partner introduction requires additional consent.

Can Sydney or regional NSW land be assessed?

The initial checklist works across Australia, including Sydney and regional NSW. It does not validate site-specific local planning or network capacity; the relevant local authorities and network must confirm these.

Related guides

Landowner guideGrid connectionDeveloper guide

Sources and references

AEMO: Network connections ARENA: Solar PV NSW Planning: Renewable energy