Solar farms guide

Solar Farm Grid Connection and Capacity

The best land in the world is of little use if the nearby line is already full. Connection is often the make-or-break question.

Assess My Business for Solar

Short answer

Solar farms connect through the local distributor or transmission network. Developers lodge a connection enquiry, then an application with technical studies. Network capacity, system strength and congestion can limit output or require upgrades. Larger generators also register with AEMO and must meet performance standards.

Connection steps

  • Connection enquiry to the network service provider
  • Preliminary assessment of capacity
  • Detailed application and studies
  • Connection agreement and works
  • Registration and commissioning tests

Risks to understand

  • Curtailment when the network is congested
  • Marginal loss factors affecting revenue
  • Upgrade costs borne by the project

Where Shelby fits

Shelby assesses needs and, where appropriate and agreed, introduces suitable third-party providers. Shelby is not a solar installer, electrical designer, retailer, finance licensee or rebate administrator. If an introduction may earn Shelby a referral fee, this is disclosed before any details are shared.

Frequently asked questions

Who handles connection?

Your network service provider, with AEMO for larger plants.

What is curtailment?

Being told to reduce output when the network is constrained.

Can landowners apply?

Usually the developer applies.