Solar farms guide
Solar Farm Grid Connection and Capacity
The best land in the world is of little use if the nearby line is already full. Connection is often the make-or-break question.
Assess My Business for SolarShort answer
Solar farms connect through the local distributor or transmission network. Developers lodge a connection enquiry, then an application with technical studies. Network capacity, system strength and congestion can limit output or require upgrades. Larger generators also register with AEMO and must meet performance standards.
Connection steps
- Connection enquiry to the network service provider
- Preliminary assessment of capacity
- Detailed application and studies
- Connection agreement and works
- Registration and commissioning tests
Risks to understand
- Curtailment when the network is congested
- Marginal loss factors affecting revenue
- Upgrade costs borne by the project
Where Shelby fits
Shelby assesses needs and, where appropriate and agreed, introduces suitable third-party providers. Shelby is not a solar installer, electrical designer, retailer, finance licensee or rebate administrator. If an introduction may earn Shelby a referral fee, this is disclosed before any details are shared.
Frequently asked questions
Who handles connection?
Your network service provider, with AEMO for larger plants.
What is curtailment?
Being told to reduce output when the network is constrained.
Can landowners apply?
Usually the developer applies.