Commercial solar guide

Grid Connection for Business Solar

A quote can look great until the network says you can export only a fraction of it. Ask about connection before you compare prices.

Assess My Business for Solar

Short answer

Your local distributor must approve any grid-connected solar system. It may set an export limit, require protection equipment or ask for network studies on larger systems. Find your distributor on your bill, ask your installer to apply before final design, and allow time for approval.

What the distributor checks

  • System size and inverter capacity
  • Export limit at your connection
  • Protection and anti-islanding
  • Metering changes

Where Shelby fits

Shelby assesses needs and, where appropriate and agreed, introduces suitable third-party providers. Shelby is not a solar installer, electrical designer, retailer, finance licensee or rebate administrator. If an introduction may earn Shelby a referral fee, this is disclosed before any details are shared.

Frequently asked questions

Who approves solar connection?

Your local distribution network.

Can I install without export?

Yes, with zero-export control, often approved faster.

How long does approval take?

It varies by network and size.