Commercial solar guide
Rooftop Solar for Business
The roof that looks perfect from the car park may need replacing in five years. Fix the roof question before the solar question.
Assess My Business for SolarShort answer
Rooftop solar is the most common commercial setup. Check roof structure, remaining life, material, shading, orientation, safe access and switchboard capacity. Leased buildings need written landlord consent. Size the system to daytime demand and export limits, not simply to fill the roof.
Roof checks
- Structural capacity for panel weight
- Remaining roof life
- Asbestos or fragile sheeting
- Shading and orientation
- Safe access for installation and maintenance
Where Shelby fits
Shelby assesses needs and, where appropriate and agreed, introduces suitable third-party providers. Shelby is not a solar installer, electrical designer, retailer, finance licensee or rebate administrator. If an introduction may earn Shelby a referral fee, this is disclosed before any details are shared.
Frequently asked questions
Should I replace an old roof first?
Often, as removing panels later adds cost.
Can solar go on a leased building?
With written landlord consent.
Do I fill the roof?
Only if demand or export rules support it.