Commercial solar guide
Multi-Site Solar for Business
With ten sites, the temptation is to install everywhere at once. Ranking sites first usually delivers better returns and simpler procurement.
Assess My Business for SolarShort answer
Multi-site businesses should rank locations by daytime demand, roof condition, tenure and network limits, then standardise specifications and tender as a portfolio. Each meter is usually sized separately. Consistent monitoring across sites makes performance comparable.
Portfolio steps
- Collect bills and interval data per site
- Rank by load, roof and tenure
- Standardise equipment and monitoring
- Tender priority sites as a tranche
Where Shelby fits
Shelby assesses needs and, where appropriate and agreed, introduces suitable third-party providers. Shelby is not a solar installer, electrical designer, retailer, finance licensee or rebate administrator. If an introduction may earn Shelby a referral fee, this is disclosed before any details are shared.
Frequently asked questions
Can one system serve several sites?
Not usually; each meter is sized separately.
Is portfolio tendering cheaper?
It can simplify procurement and support better terms.
Which sites first?
Those with the highest daytime demand and sound roofs.