How to reduce electricity costs in a factory
Start with the electricity bill and two comparable production periods. Put shift hours, units produced and major starts beside the usage record. A bigger bill can reflect more production, higher prices or a peak demand charge. Each calls for a different review.
Compare running and idle hours
Plot a production day and a shutdown day if interval data is available. Look at compressed air, extraction, refrigeration and other loads that may continue between shifts. Ask the site team which loads must stay on and which can be investigated. Record electricity per tonne or unit only for comparable production and billing dates.
Find the demand interval
If the bill lists a demand charge, check its kW or kVA value and tariff basis. Use interval data to see whether the peak coincided with a restart, simultaneous equipment starts or another scheduled load. Have operations and maintenance staff assess any proposed schedule changes against production and equipment requirements.
What would an idle load cost?
An illustrative steady 8 kW over 12 hours uses 96 kWh. At 20 cents per kWh that is $19.20 in usage charges for that period. The avoidable amount depends on which equipment has to operate and the applicable rate.
Can I include gas? Yes. Add a gas invoice for boilers, ovens, drying or process heat and keep fuel quantities separate.
Frequently asked questions
What is causing our peak demand charge?
Check the billed kW or kVA and its tariff basis, then use interval data to see whether the peak matched a restart, simultaneous starts or another scheduled load.
How much electricity does the factory use when idle?
Compare a shutdown day with a production day using interval data. Compressed air, extraction and refrigeration often continue between shifts; ask the site team which must stay on.
Can I include gas?
Yes. Add a gas invoice for boilers, ovens, drying or process heat and keep fuel quantities separate from electricity.
Sources & References
- energy.gov.au, Australian Government: compressed air guide
Publication: Date not verified
Observation period: Not recorded
Relevant page / section: Claim-level locator not yet verified
Last link / title verification: Not verified
Verification incomplete, do not rely on this reference for an investment or approval decision.
Source metadata and claim-level evidence require verification.
- energy.gov.au, Australian Government: review your energy contract
Publication: Date not verified
Observation period: Not recorded
Relevant page / section: Claim-level locator not yet verified
Last link / title verification: Not verified
Verification incomplete, do not rely on this reference for an investment or approval decision.
Source metadata and claim-level evidence require verification.