Illustrative models, not achieved client results
Commercial Solar Worked Examples
Similar annual bills can lead to different solar decisions. These hypothetical examples show how load timing, resilience, tenancy and seasonal operations change the questions to ask before choosing equipment.
Assess a Similar OpportunityShort answer
These examples are educational scenarios, not verified Shelby customer installations or achieved savings. They compare manufacturing, refrigeration and irrigation decisions using declared operating assumptions. No installed prices, generation, payback or incentive entitlement is asserted. Use your own bills, interval data, site survey and itemised quotations for a project-specific assessment.
NSW manufacturer: a large roof, a weekday load
A hypothetical Western Sydney manufacturer operates weekday shifts but closes at weekends. Its roof appears large enough for a substantial array. The owner initially assumes filling the roof will maximise the saving. Weekend generation could exceed demand, while an unconfirmed export limit may restrict what reaches the grid. A roof survey also needs to establish structure and access. Compare a demand-matched system with a larger option using the same interval data and approved export limit. Additional panels have value only when their output can be used or sold under real terms.
- Obtain weekday and weekend interval data
- Confirm network export limits in writing
- Check roof condition and switchboard capacity
- Compare itemised alternatives on identical tariffs
| Option | Decision to compare | Evidence needed |
|---|---|---|
| Demand-matched PV | Lower unused weekend output | Interval data and itemised quote |
| Larger PV | More output, but possible export or curtailment | Approved export limit and retailer credit |
| PV with storage | Possible evening or peak use | Separate dispatch model and storage quote |
Victorian cool store: daytime savings, separate backup
A hypothetical Victorian cool store runs refrigeration throughout the day and night. Its operator wants lower purchased electricity costs and also asks whether rooftop solar will protect stock during a power outage. Ordinary grid-connected PV does not provide outage backup. Annual consumption alone also cannot establish a battery's required power, duration or ability to cover compressor starts. Assess daylight self-consumption and critical-load resilience as separate decisions. Engineers must confirm backup circuits, transfer arrangements and the battery or generator needed for the site's continuity plan.
- Separate essential and non-essential circuits
- Review compressor demand and starting currents
- Model summer and winter load overlap
- Agree who responds to monitoring faults
| Option | Decision to compare | Evidence needed |
|---|---|---|
| Solar PV only | Offsets some daylight grid use | Site load and generation model |
| Storage for tariff shifting | Moves energy between periods | Tariff intervals, usable kWh and losses |
| Engineered backup | Supports agreed critical loads | Protection, transfer and resilience design |
Queensland irrigator: store water or store electricity?
A hypothetical Queensland horticultural business pumps heavily during its irrigation season. It is comparing a battery with scheduling more pumping in daylight into existing water storage. A battery adds equipment, conversion losses and maintenance. Water storage might offer scheduling flexibility, but pumping must remain compatible with agronomy, water permissions and available storage. Compare daytime pumping, electrical storage and the existing operating pattern before choosing equipment. Quiet-season output and grid or diesel integration need separate consideration; no irrigation savings are assumed.
- Record pump kW and seasonal operating hours
- Confirm irrigation and water-storage constraints
- Check meter and pump locations
- Assess quiet-season exports or curtailment
| Option | Decision to compare | Evidence needed |
|---|---|---|
| Daylight pumping | Uses solar directly | Pump flexibility and water permissions |
| Water storage | Shifts the timing of water delivery | Storage volume, pumping head and losses |
| Electrical battery | Supports pumping outside daylight | Dispatch, autonomy and quoted lifetime cost |
Evidence and publication method
Every example here has status illustrative_model. State and industry are scenario context, not a client location. Consumption, generation, project cost, savings and completion date remain unknown. Illustrative photos depict a type of site, not a documented Shelby installation. A future verified_client_case requires permission to publish, attributable project evidence, periods, tariffs, measured results and named reviewer approval. It will be clearly separated from these examples.
How to apply an example to your business
- Collect twelve months of bills and interval data where available
- Separate operating assumptions from measurements
- Identify land, roof, lease and network constraints
- Compare proposals on the same tariff and cost boundary
- Request technical and financial advice before committing
Frequently asked questions
Are these real Shelby client results?
No. Every scenario is explicitly hypothetical and has no claimed client, installation date or achieved saving. Verified case studies will only be added with attributable evidence and publication permission.
Can I apply an example saving to my own bill?
No saving is asserted here. Use your own tariff, load timing, generation model, approved exports and quoted costs in the calculator. A similar industry or roof size does not establish a similar financial result.
Why compare the same annual bill across different operations?
Solar value depends on coincident demand, not only annual use. A weekday factory, continuous cool store and seasonal pump can use a different share of daytime output, and storage or load shifting changes the comparison again.
What would make a case study verified?
A consented case needs identifiable source evidence, the installation and measurement periods, scope, operating changes, costs and tariffs, measured results and reviewer approval. Modelled and achieved figures must be separately labelled.