Development & Construction Finance

Explore development & construction finance in Australia. Compare key costs, risks and documents, then prepare your next questions for a qualified adviser.

What should you know about development & construction finance?

Development finance funds construction of residential or commercial projects. Senior debt (first mortgage) typically covers 65–75% of Total Development Cost (TDC) or 55–70% of Gross Realisation Value (GRV). Presales of 60–100% are usually required. Non-bank lenders and construction specialists dominate, banks limit to ~65% LVR on qualifying files only.

How do I distinguish construction funding from development finance?

An owner building a home and a developer seeking project funding face different assessment processes. Identify which structure applies before comparing facilities. Review approvals, builder contract, progress payments, contingency and the exit plan together. Ask how delays or a valuation shortfall would be funded rather than assuming the facility covers every project cost.

Questions to take to your adviser: Development & Construction Finance

Use these points to prepare a scenario-specific discussion. Ask which assumptions apply to you, which evidence is missing and which conditions should be confirmed before proceeding.

  • TDC/GRV ratios drive loan sizing.
  • Presales are non-negotiable on residential 4+ unit projects.
  • Mezzanine funding costly but stretches equity.
  • QS reports required at each drawdown.

Frequently asked questions

How do I distinguish construction funding from development finance?

An owner building a home and a developer seeking project funding face different assessment processes. Identify which structure applies before comparing facilities. Review approvals, builder contract, progress payments, contingency and the exit plan together. Ask how delays or a valuation shortfall would be funded rather than assuming the facility covers every project cost.

Continue your research

Sources & References

Small residential builds and large mixed-use projects share the same funding logic: the lender wants proof the project completes, sells (or leases) and repays without them holding the asset.

TDC vs GRV

TDC = land + construction + soft costs + interest reserve + contingency. GRV = expected end value of all units/premises. Lenders test both ratios; the tighter one caps the loan.

Presale requirements

For 4+ unit residential: 60–100% qualifying presales (unrelated buyers, 10% deposits held in trust, unconditional contracts). Below 4 units, presales often not required, treated as construction loan.

Rates and terms

Senior debt 7–10% variable in 2026. Mezzanine (second tier) 12–18%. Terms 12–24 months for construction, extendable. Line fees 0.5–2% upfront plus valuation and QS reports.

Sydney small-dev · 4-townhouse site, TDC $4.6M

A small developer acquires a 900m² site in Sydney's inner-west for $1.9M and builds 4 townhouses. Total development cost is $4.6M; GRV (gross realisation value) is $6.2M.

TDC: $4,600,000

GRV: $6,200,000

LVR (TDC): 70%

Development margin: 34.8%

Australian dev-finance lenders test on TDC-LVR (65–75%) AND profit-on-cost (usually >20%). Below 20% margin, the deal is typically shelved or requires equity injection.

Frequently asked questions

How much equity do I need to start?

Typically 25–35% of TDC in cash or land equity. Some non-banks accept lower with mezzanine top-up.

What is a construction loan vs development finance?

A construction loan is for owner-occupier or single-dwelling investment builds (up to $2m typical). Development finance is for multi-unit or commercial projects with sales/lease-up assumptions.

Can I get finance for a small subdivision?

Yes, 2–3 lot subdivisions are widely funded by regional non-banks. LVR 60–70% of end value, term 12–18 months.