Commercial Solar 100 kW to 1 MW: 2026 STC Eligibility Explained
Eligible mid-scale solar PV systems above 100 kW and up to 1 MW installed on or after 1 October 2026 can apply for STCs under the expanded Small-scale Renewable Energy Scheme. Applications are open in the REC Registry as at November 2026.
Assess My Business for SolarShort answer
Eligible Australian systems above 100 kW up to 1 MW installed on or after 1 October 2026 can create STCs. The deeming period is fixed at five years, subject to full eligibility rules such as approved components, accredited design and installation, and related-system boundaries. Applications opened in the REC Registry in November 2026.
Why this band matters
Factories, cold stores, shopping centres and large warehouses often need 150 kW to 1 MW. Before October 2026 these systems usually sat outside STCs. The change can materially reduce upfront cost for eligible projects.
What to check
- Total capacity, including related systems on the same site
- Installation date on or after 1 October 2026
- Approved components and accredited design and installation
- Five-year deeming and how STCs are calculated
- STC versus REGO choice and exclusivity
- Network and export approvals, which are separate from certificates
Documents to keep
- Single-line diagram and design
- Component lists and serial numbers
- Accreditation details of the designer and installer
- Network connection approval
- Commissioning records
Frequently asked questions
Are 150 kW solar systems eligible for STCs?
An eligible 150 kW system installed on or after 1 October 2026 falls in the mid-scale band. Confirm full eligibility with the Clean Energy Regulator rules and your accredited provider.
Does an existing 100 kW system affect an extension?
It can. Related-system rules decide whether capacities are combined. Have your provider check this before you sign.
Can my site claim STCs and REGO?
Not for the same generation in incompatible ways. The scheme choice should be made with advice before installation.
Do all 1 MW sites qualify?
No. Capacity is one test. Components, accreditation, install date and the full rules also apply.